The Deutschlandnetz June 6, 2025
Share

Eviny opens XL charging park in the German network in Fürth

On June 5, the Norwegian charging infrastructure operator Eviny opened one of the first XL charging parks in the nationwide German network in Seeackerstrasse in Fürth. The facility with 16 fast-charging points is located in the parking lot of a supermarket. Charging takes place exclusively with 100 percent green electricity. The ultra-modern technology allows electric vehicles to charge up to several hundred kilometers of range in just a few minutes, depending on the model.

The location makes it possible for travelers and residents to combine charging with everyday errands. Various stores are located in the immediate vicinity. The nearby Fürth-Ronhof highway exit ensures good accessibility for long-distance traffic. Two of the charging points are also barrier-free.

Federal Minister of Transport Patrick Schnieder: „Our goal is clear: fast charging anytime and anywhere. To achieve this, we are working with companies to create a nationwide fast-charging infrastructure with Deutschlandnetz. Several new Deutschlandnetz charging parks are currently going into operation every week. We are delighted that one of the first large charging parks is now opening in Fürth. It brings us another step closer to emission-free mobility.“

Emission-free construction

The new charging park in Fürth was built completely emission-free, making it one of the first construction sites in Germany with zero emissions. The civil engineering work was carried out using electric excavators, while electric trucks removed the excavated material. A mobile charging station and a photovoltaic-powered battery supplied the required energy on site.

„Participation in the German grid is a significant step for us, and we are consistently focusing on sustainability - from emission-free construction to operation with 100 percent green electricity,“ says Ragnhild Janbu Fresvik, CEO of Eviny. „We are contributing our many years of experience from the Norwegian market and are delighted to be part of the mobility transition in Germany.“

The Germany network: nationwide fast-charging infrastructure

With the German network, the Federal Ministry of Transport (BMV) is working with charging station operators to create 9,000 additional fast-charging points for electric cars at more than 1,000 locations. In total, the BMV is investing around 2.3 billion euros in the construction and operation of the locations. These are being built in rural regions, in cities and at unmanaged highway service areas.

The National Charging Infrastructure Control Center under the umbrella of NOW GmbH coordinates the implementation of the German network on behalf of the BMV and is responsible in particular for demand planning, checking technical requirements and data monitoring of the locations.

Eviny was awarded the contract for 140 locations as part of the 2023 tender - as one of just a few international companies. The charging park in Fürth is one of the first to be opened by Eviny as part of this program.

Technical details:

  • Open around the clock (24/7)
  • 4 meter access height for all vehicle types
  • Up to 400 kW maximum charging power
  • European CCS plug, compatible with all common electric vehicles
  • Ultra-fast charging stations with 400 kW output
  • Several barrier-free parking spaces with sufficient space for wheelchairs

Further information on the German network can be found at: www.deutschlandnetz.de

Photo credit: © Eviny / Daniel Kummer